The permit is required before you can begin work (breaking ground) on any project that touches the public right-of-way.
1. Approaches and Driveways (Approach Permit): You must secure an Approach Permit for all new approaches to roads and rights-of-way. This covers:
- Building a new driveway, whether for a Field, Single Residence, Multiple Residence, or Commercial property
- The approval process for subdivisions specifically requires obtaining an approach permit
- Before surfacing the driveway with concrete or asphalt or receiving a certificate of occupancy, you must call for an inspection of the approach
2. Work or Installations within the Right-of-Way (Right-of-Way Permit): A permit is necessary for any use of the public road right-of-way that is not vehicular travel along the roadway . This requirement, governed by Idaho Code Section 50-1330, applies to items such as:
- Buried utilities, signs, utility poles, conduits, and landscaping .
- Utilities installed within the right-of-way must secure a permit to use the right-of-way from the respective Highway District [209.03].
Permit Conditions and Deadlines
If you are issued a permit, you must comply with certain conditions, including safety precautions and deadlines:
- Completion Deadline: The permit application, once issued, expires 90 days from the date of issuance. If the work is not completed to the Highway District’s standards within that period, you may request a 90-day extension, otherwise the application is void.
- Safety and Excavation: You are required to call the 8-1-1 utility locating service (“Call Before You Dig”) before starting any excavation within the right-of-way.
- Final Inspection: Upon completion of the work, you must notify the District that the project is finished and ready for final inspection. The installation must be inspected and approved by the Director of Highways or their representative.
- Applicant Responsibility: As the permittee, you have the primary responsibility for ensuring the protection and safety of the traveling public during the work. You are also responsible for removing all rubbish and debris and leaving the roadway and roadside neat and presentable to the satisfaction of the Highway District.